Mehmet Karabeyoglu, managing director of Proteksan-Turquoise, issued this response.


“At a positive level, it is clear that we built and delivered a yacht according to state-of-the-art regulations and rules. The yacht complied with Division 242. However, the report is a limp effort.

 

“On 21st December 2012, we submitted a detailed response to the BEAmer draft report into the foundering of Yogi. Our comments were carefully considered and prepared with the help of our independent technical expert.


“We are extremely disappointed to see that a significant number of our comments on the draft have been not taken into account in the final BEAmer report, nor are they acknowledged. We do not expect our view to automatically hold sway, but what is disturbing [is] in several places where we pointed out errors in the conclusions drawn by BEAmer, in the final report, we now read altered hypotheses [that] support the conclusions we criticized. The alterations circumvent failings that we identified. For example, in the draft report, BEAmer mentioned that the speed of the Yogi was 16.7 knots at a 60 percent load on the engines. From our own sources, the speed originally cited by BEAmer was close to being correct. We advised them that the loading was incorrect, because at that speed and if the 16.7 knots speed was correct (which we believe it was) then the correct engine loading would be 100 percent; pushing any vessel in those conditions at 100 percent load is not wise. BEAmer decided to maintain the 60 percent loading and reduce the speed of the yacht in [the] final version. One has to ask why? Even though the yachts AIS was turned off, we know exactly what time Yogi left the Dardanelles, there are pilots’ records [that] clearly state when she cleared and we have the captain’s statements as to when the engines overheated. A simple calculation, which takes into account the distance travelled and the time it took to travel that distance, places the speed at around 16.7 knots and, of course, we have the original sea trial reports that confirm this speed can only be achieved at 100 percent load.


“We also presented them with photographs taken from the rescue helicopter, which shows the boat upright before the sinking. This photograph is significant, although we don’t want to go in details at this time. Photographs also show aft deck cushions, which were stored in the beach club, floating next to the yacht. This raises the question ‘how did they come out?’ of the beach club where they were stored? We also note that BEAmer accepted that assertion that the crew were able to see one meter of water in the beach club by using the outside watertight door. When we read the draft report, we thought that it was impossible to open that door inwards against one meter of water. We calculated the force needed to open the door. With the assumption there was no water in the staircase, if it is pushed on the handle, which is at the center of the door, 460 kilograms [of] force is required to open the door. If it is pushed on the farthest edge of the door, 230 kilograms [of] force is required. In the final report AFTER we pointed out the amount [of] force needed to open the door, new words were introduced into the report that state there was a lurch to port [that] forced the door open.

 

“But instead of looking at these human issues in any serious detail, BEAmer has chosen to concentrate on stability issues. It is common knowledge that stability of yachts and ships are based on different scenarios, and following inclination tests by computer software, this is carried out with the inspector of flag authority. If this test is ever doubted, due to a change in weight of the yacht or other loading conditions, this test must be repeated immediately, which can be done at any shipyard anywhere in the world as long as a surveyor from class and/or flag state authority is present.


“The yacht was delivered in May 2011 and cruised extensively during the entire summer season. When she was back at the yard for warranty repairs, which were largely painting and other minor issues, initially the owners wanted to repeat the inclining test and, yes, that was on the original warranty list. Yogi was in the shed for painting, and this test could only be carried out in water after the re-launching. When we received the final warranty list, the request for the stability test had been removed by the owners, so this was not performed. We have the emails [that] prove this, including the email from the owners representative with the final warranty list. Finally, following a short sea trial, the warranty list was signed off and Yogi left. There was never ever a suggestion that the yard had refused a stability test and there was no reservation on the warranty list relating to stability. We can only conclude that stability was not an issue, otherwise the captain would not have sailed for months if he had doubts about stability and certainly would not have sailed into poor weather after the warranty work if he had serious concerns about stability. The only inclining test done to date was done by ABS on behalf of the French flag before delivery. It was valid then. It is valid today because no intervening testing took place.


“As you can see, it is extremely alarming to us that BEAmer has concentrated on the initial warranty list, not the final agreed warranty list, which the owners had remove[d] the inclining test. BEAmer was supplied with the complete signed-off warranty list, yet BEAmer have only published a single page of that warranty list and not only that, but that page is incomplete. BEAmer had one full year to complete the report, yet this critical point, which throws a serious allegation at us, was excluded from the draft we were asked to comment on. Even if it is true, as BEAmer claims, that this allegation only gestated in January, they did not seek to verify this serious allegation.


“The allegation that important build modifications were not communicated to Flag is nonsense. Elsewhere, [the] report states that the additional keel and the drawings were approved by ABS, who had delegated Flag authority. The draining circuit was an owners’ post-delivery request for which the owner had not sought class approval.


“BEAmer claims that damage stability criteria did not take into account the most adverse situation (two contiguous aft compartments flooded), but they also concede that such flooding contingency is not a requirement of Division 242 and was only the subject of a French flag internal memo that was sent neither to ABS or us.


“Yogi sank in 7–8 hours after the initial incident. It is hard to fathom how the water flooded into three watertight compartments. The yacht had electrical power right up until the final sinking; why weren’t all three bilge pumps operated to try and save the yacht?


“These few issues makes the report extremely disappointing, and we do not understand the process that BEAmer used to collect and verify evidence. However, BEAmer’s general recommendations do merit consideration, even if several of their 10 key points are not supportable by evidence or contradict what BEAmer themselves have written elsewhere in the report.”

Share This Post

Leave a comment

Your email address will not be published. Required fields are marked *

Please answer the question below to leave a comment. * Time limit is exhausted. Please reload CAPTCHA.

Editor’s Picks

Triton Expo is Oct. 12

Mid-October is time for The Triton’s biggest event of the year, our fall Triton Expo. This year, we’ve gathered about 50 businesses to …

Women just do their jobs in yachting; rooming, agencies and hiring could improve

Women just do their jobs in yachting; rooming, agencies and hiring could improve

When we decided to gather a group of women for a Triton From the Bridge lunch, it sounded like a great idea, but as soon as we all sat …

Doors, power, access surprise firefighters and crew in yacht training

Doors, power, access surprise firefighters and crew in yacht training

As part of the fire team on M/Y Archimedes, Bosun Max Haynes knows how to fight fire onboard the 222-foot (68m) Feadship. But he was …

Crew Unlimited and ICT in Ft. Lauderdale join with Bluewater in Europe

Crew Unlimited and ICT in Ft. Lauderdale join with Bluewater in Europe

Crew, employees, industry expect opportunities as European and U.S. companies partner to expand yacht crew training, …

Events