The Triton

News

FDOT unveils plan for pedestrian bridge over New River — CANCELLED

ADVERTISEMENT

UPDATE: March 6, 2019

FDOT has cancelled this meeting and the feasibility study related to a pedestrian bridge over the New River. In a letter on March 5, 2019, FDOT said: “The New River Pedestrian Crossing PD&E study has been cancelled. The Department will scale back the study and evaluate signing and/or pavement marking options to provide a safe alternate route for the bicyclists and pedestrians crossing the New River.”

UPDATE: FEB. 27, 2019

FDOT has organized a meeting to discuss the Project Development and Environment (PD&E) study on this pedestrian bridge, and it is open to the public.

Anyone with concerns or feedback about this bridge is encouraged to attend.

The meeting is scheduled for March 14 in Fort Lauderdale. Click here for more details.

ORIGINAL REPORT: June 19, 2018

The Florida Department of Transportation issued a feasibility study for a pedestrian/bicyclist bridge over the New River in downtown Fort Lauderdale.

The team evaluated alternatives at four locations over the river as well as several “no-build” alternatives including a water shuttle to cross the river or trolley service to transport pedestrians and cyclists on U.S. 1 through the existing Henry E. Kinney Tunnel under the river.

One option. Rendering from T.Y. Lin International Group

The 57-year-old tunnel’s “poor vehicular visibility and narrow sidewalks make the pedestrian experience crossing Federal Highway less than desirable and make the tunnel prone to pedestrian and bicyclist accidents,” according to the FDOT study.

Members of the marine industry have expressed concern over another bridge impeding marine traffic, not to mention the high cost of building it that could be better spent elsewhere.

To read the proposal visit Florida Department of Transportation.

Related Posts...
UPDATE:The 40m award-winning racing sloop My Song has been declared Read more...
A 120-foot (36.6m) Tecnomar Evo 120 yacht went up in Read more...
A worker at a marina on the Dania Cutt-off Canal Read more...
In a revision to its regulations for merchant mariner credentials, Read more...
By Dorie Cox The U.S. Department of the Treasury on Read more...

Share This Post

Leave a comment

Your email address will not be published. Required fields are marked *

Please answer the question below to leave a comment. * Time limit is exhausted. Please reload CAPTCHA.

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Editor’s Picks

40m S/Y My Song recovered, taken to Palma

40m S/Y My Song recovered, taken to Palma

UPDATE:The 40m award-winning racing sloop My Song has been declared unsalvageable after falling off a cargo ship in the Med while in …

Newport19: Charter show opens today

Newport19: Charter show opens today

Crew from more than 20 yachts worked hard to keep the raindrops at bay at Newport Shipyard this morning as the annual Newport Charter Show …

Crew Compass: Cruising  brings joy in places we had not expected

Crew Compass: Cruising brings joy in places we had not expected

Crew Compass: by Lauren Loudon Being offered a new job is always an exciting time and, as I’ve mentioned previously, there are …

Engineer’s Angle: Engineer key to safety on a yacht

Engineer’s Angle: Engineer key to safety on a yacht

Engineer's Angle: by JD Anson Whether tied to the dock or a thousand miles from shore, the safety of boat and personnel are of …