The Triton

News

FDOT unveils plan for pedestrian bridge over New River — CANCELLED

ADVERTISEMENT

UPDATE: March 6, 2019

FDOT has cancelled this meeting and the feasibility study related to a pedestrian bridge over the New River. In a letter on March 5, 2019, FDOT said: “The New River Pedestrian Crossing PD&E study has been cancelled. The Department will scale back the study and evaluate signing and/or pavement marking options to provide a safe alternate route for the bicyclists and pedestrians crossing the New River.”

UPDATE: FEB. 27, 2019

FDOT has organized a meeting to discuss the Project Development and Environment (PD&E) study on this pedestrian bridge, and it is open to the public.

Anyone with concerns or feedback about this bridge is encouraged to attend.

The meeting is scheduled for March 14 in Fort Lauderdale. Click here for more details.

ORIGINAL REPORT: June 19, 2018

The Florida Department of Transportation issued a feasibility study for a pedestrian/bicyclist bridge over the New River in downtown Fort Lauderdale.

The team evaluated alternatives at four locations over the river as well as several “no-build” alternatives including a water shuttle to cross the river or trolley service to transport pedestrians and cyclists on U.S. 1 through the existing Henry E. Kinney Tunnel under the river.

One option. Rendering from T.Y. Lin International Group

The 57-year-old tunnel’s “poor vehicular visibility and narrow sidewalks make the pedestrian experience crossing Federal Highway less than desirable and make the tunnel prone to pedestrian and bicyclist accidents,” according to the FDOT study.

Members of the marine industry have expressed concern over another bridge impeding marine traffic, not to mention the high cost of building it that could be better spent elsewhere.

To read the proposal visit Florida Department of Transportation.

Related Posts...
Nominations are open for Acrew’s 2019 Crew Awards, an annual Read more...
Spanish shipyard Varadero Valencia has expanded and reinforced its range Read more...
The Triton took advantage of Demo Day at Nautical Ventures Read more...

Share This Post

Leave a comment

Your email address will not be published. Required fields are marked *

Please answer the question below to leave a comment. * Time limit is exhausted. Please reload CAPTCHA.

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Editor’s Picks

Stew Cues: Table seating, service order dictated by varying factors

Stew Cues: Table seating, service order dictated by varying factors

Stew Cues: by Alene Keenan Some of the most frequently asked questions I get regarding mealtimes are how to seat the guests at the …

Top Shelf: Sunchoke Vichyssoise with Smoked Salmon and Golden Quail Egg

Top Shelf: Sunchoke Vichyssoise with Smoked Salmon and Golden Quail Egg

Top Shelf: by Chef Timothy MacDonald All that glitters is not gold. But when in desperate need to elevate a dish to new heights, gold, …

Former Chief Stew Johanna Mueller dies

Former Chief Stew Johanna Mueller dies

By Lucy Chabot Reed Johanna Mueller broke into yachting the old fashioned way. While working at a hardware store, her work ethic shone …

Engineer’s Angle: Rapport in repair relies on client-tech respect

Engineer’s Angle: Rapport in repair relies on client-tech respect

Engineer's Angle: By JD Anson Hiring and dealing with contractors can be a nightmare, or a dream. After spending significant time on …